J. Hefei Univ. Tech. (Nat. Sci.)
Competent Authorities: Ministry of Education of the People's Republic of China
Sponsor by: Hefei University of Technology
ISSN 1000-1646, CN 34-1001/N
墩前冰盖长度对桥墩局部冲刷影响试验研究
J. Hefei Univ. Tech. (Nat. Sci.), Aug. 2026, Vol. 49 No. 8: 1098-1106
DOI: 10.3969/j.issn.1003-5060.2026.08.014
WEI Song $ ^{1,2} $, DAI Qichao $ ^{1} $, WANG Xudong $ ^{1} $, LI Gen $ ^{1} $
(1. School of Civil and Hydraulic Engineering, Hefei University of Technology, Hefei 230009, China; 2. Anhui Key Laboratory of Civil Engineering Structures and Materials, Hefei 230009, China)
魏松 $ ^{1,2} $,戴齐超 $ ^{1} $,汪旭东 $ ^{1} $,李根 $ ^{1} $
(1. 合肥工业大学土木与水利工程学院,安徽合肥 230009;2. 土木工程结构与材料安徽省重点实验室,安徽合肥 230009)
国家重点研发计划资助项目(2022YFC3202502);安徽省自然科学基金资助项目(2308085US07)