J. Hefei Univ. Tech. (Nat. Sci.)
Competent Authorities: Ministry of Education of the People's Republic of China
Sponsor by: Hefei University of Technology
ISSN 1000-1646, CN 34-1001/N
基于收敛-约束法的岩溶隧道支护时机研究
J. Hefei Univ. Tech. (Nat. Sci.), Jul.2024, Vol.47 No.7: 986-994
DOI: 10.3969/j.issn.1003-5060.2024.07.020
ZHANG Juwen $ ^{1} $, LI Yongxin $ ^{2} $
(1. China Railway Tunnel Consultants Co., Ltd., Guangzhou 511458, China; 2. School of Automobile and Traffic Engineering, Hefei University of Technology, Hefei 230009, China)
张聚文 $ ^{1} $,李永鑫 $ ^{2} $
(1. 中铁隧道勘察设计研究院有限公司,广东广州 511458;2. 合肥工业大学汽车与交通工程学院,安徽合肥 230009)
国家自然科学基金资助项目(52108312); 安徽省自然科学基金资助项目(2108085QE250)和中央高校基本科研业务费专项资金资助项目(JZ2021HGTA0160)