The construction of crossing gallery under the urban roads
may cause uneven settlement or even excessive settlement, which will
affect the normal traffic and even cause traffic accidents. In order to
study the influence of shallow buried pipe gallery project on pavement
settlement, based on the integrated pipe gallery project of the third
section of the rapid transformation project of Susong Road in Hefei
City, the parameters of pipe shed and small conduit in advanced support
were analyzed by field measurement and numerical simulation. The results
show that the diameter of pipe shed has little effect on the control of
ground surface settlement. There is an optimal circumferential spacing
of
for pipe shed. As the distance between pipe shed and lining increases,
the supporting effect of pipe shed decreases. The pipe shed support can
be used alone, and small conduit can only be used as an auxiliary
advanced support method. The comprehensive supporting effect of pipe
shed and small conduit is likely to be superposition of their respective
supporting effects. Considering other unstable factors in actual
construction, the best supporting scheme is as follows: for pipe shed,
the diameter is
, the circumferential spacing is
, and the distance from the lining is
; for small conduit, the external intercalation angle is
, the circumferential spacing is
, and the length is
.